Fangar
Member
Ok a Lot of Flat work... Real Flat...
My wife decided it was time to put in some laminate flooring in the kitchen area. Two days solid, but I got all of the floor in this evening. Just shy of 400 sqft. Dupont Walnut block. It came out very nice. I am still waiting for all of the trim pieces (Quarter round, carpet reducers, T-moulding, and hard surface reducers) which are ALL on backorder until the 17th. The base boards and door casings are all cut, and painted. They will be put in tomorrow. One thing for sure... I am still young, but I hurt more than I used to. Thanks for looking.
Before (Kitchen)...
Before (Hallway)...
After...
After...
Cheers,
Fangar
My wife decided it was time to put in some laminate flooring in the kitchen area. Two days solid, but I got all of the floor in this evening. Just shy of 400 sqft. Dupont Walnut block. It came out very nice. I am still waiting for all of the trim pieces (Quarter round, carpet reducers, T-moulding, and hard surface reducers) which are ALL on backorder until the 17th. The base boards and door casings are all cut, and painted. They will be put in tomorrow. One thing for sure... I am still young, but I hurt more than I used to. Thanks for looking.
Before (Kitchen)...
Before (Hallway)...
After...
After...
Cheers,
Fangar