I had a few minutes before I could clock out and was just trying out the software. The fishbone is something the President of the Company likes, so our bosses are pushing them. There are only 6 of us out of 40 or so in the department that got the software. If you look at the bottom, last 2, they details are not in chronological order. And yes there are several things missing. Clean water, CA glue finish, inspect the blank, select the kit, paint the tube, take a drink, clean the work area (ha like we do that), etc.