Gary Max
Member
After months of work--buying parts--hunting for that Right motor.
She is done. Fed-ex dropped off the last parts today--they came from Lee Valley--(real nice folks)
Motor is a Dayton 1/4 hp Dc with variable drive control
I went with the 7 inch tool rest as well.
As soon as I get the other projects that I am building done I am going to spend some time with my new lathe.
We ain't going to talk about how much money you can drop on these lathes-- I also have the metal lathe parts for the lathe.
She is done. Fed-ex dropped off the last parts today--they came from Lee Valley--(real nice folks)
Motor is a Dayton 1/4 hp Dc with variable drive control
I went with the 7 inch tool rest as well.
As soon as I get the other projects that I am building done I am going to spend some time with my new lathe.
We ain't going to talk about how much money you can drop on these lathes-- I also have the metal lathe parts for the lathe.