ashaw
Member
In august 2013 I was contacted to do a job for a company. In December 2013 we closed on the contract. It is for 500 pens plus any additional pens that I could get out of the material. Normal I do not do wooden pens, but this account because of the history could not turn down. Wooden oak floor about 100 years old with a history. Right now I could not disclose the company or where the floor is from. I am hoping that when the project is done I can disclose project in detail.
Here are some pics. The flooring before it was cut up. And the remain 203 blanks that I finished drill yesterday. Note the blanks were sent out to be stabilized before drilling.
I also pickup up a 125 pen order. The 125 pen order due in two weeks. the above order due in 7 weeks.
Here are some pics. The flooring before it was cut up. And the remain 203 blanks that I finished drill yesterday. Note the blanks were sent out to be stabilized before drilling.
I also pickup up a 125 pen order. The 125 pen order due in two weeks. the above order due in 7 weeks.